Why a replacement pack arrives incomplete
Newer Tesla replacement HV battery packs are built without PTC heater electronics. The pack bolts in, the coolant circuit fills, the car drives – and the cabin heater chain is still missing a module. Tesla handles this with a separate procedure, PTC Heater Electronics (Retrofit), correction code 16014567, FRT 1.02.
Two conditions are printed at the top of the page and both are easy to miss. The procedure begins with the old pack already removed from the vehicle, and the correction must be used in conjunction with the HV battery remove and replace correction. It is not part of the pack swap and it does not disappear inside it. If you quote only the pack job, you have quoted 1.02 hours short.
What has to be on the bench before you start
This is bench work, not vehicle work. The page lists eight items; three of them are safety equipment, and the job should not start without them.
| Part number | Item | Why it matters |
|---|---|---|
| 1460601-00-A | Extractor, 4 pole HV header, Model 3 | Removes the header without levering on the carrier |
| 1131071-00-A | Dummy disconnect, pyro, safety | Goes in the moment the real pyrotechnic disconnect comes out |
| 1467483-00-C | M3 / Y penthouse service insulator kit | Keeps the open busbar area from becoming a contact hazard |
| 1076927-00-A | Hioki RM3548 | Only a micro-ohmmeter can resolve 55 to 145 micro-ohms |
| 1076928-00-A | Test probes, Hioki 9461 | Kelvin probes; clip leads will not do |
| 1780974-00-A | HV tool kit | Insulated tooling across the job |
| 1453448-01-A | Extech 335 digital multimeter set | Voltage checks around the disconnect |
| 1126453-00-A | Tweezers | Terminal and sleeve handling |
One consumable is not added to the service activity automatically: heat shrink tubing. Tesla gives three regional procurement routes, and all three describe the same spec – a 3:1 ratio, 19 mm before shrinking, 6 mm after:
- North America: Digikey punchout, 3M EPS300-3/4-48″-RED, Digikey part 3M161211-ND.
- China: order 2393485-00-A, Woer 3:1 heat shrink tubing 9.5, yellow.
- EMEA: procure any 3:1 sleeve locally, for example Foerch 3733 19.
This is the most common way the job stalls: pack on the stand, customer waiting, and no sleeve on the shelf.
Six fastening points, three torque values
| Fastener | Torque | Tool | Reuse / replace |
|---|---|---|---|
| Nuts that secure the compressor / PTC fuse | 4.5 Nm | Insulated 8 mm socket | Replace, 1104458-00-A |
| Nut on the HV battery ancillary positive busbar; nut attaching the negative AC harness to the negative HV battery DC link busbar | 4.5 Nm | Insulated 8 mm socket | Reuse |
| Bolts (x2) securing the PCS output fuse | 4.5 Nm | Insulated 8 mm socket | Replace, 1115833-00-B |
| Nuts (x2) attaching the AC negative harness to the transformer | 2.5 Nm | Insulated 7 mm socket | Reuse |
| Screw securing the HV carrier assembly | 3 Nm | Insulated Torx T20 | Reuse |
| M4 nut and bolt, terminal join | 2.5 Nm | Insulated T20 and 8 mm | Reuse |
Note the last row: the nut is 8 mm and the bolt is T20, so two tools are in your hands at the same time. All three 700 VDC 63 A fuses – compressor, PCS output and PTC heater – are marked after torque when they go back in. That pen mark is the only evidence a second technician will ever see that the joint was torqued.
The removal order is short but not optional
- Remove the ancillary bay cover.
- Remove the pyrotechnic disconnect and install the dummy disconnect.
- Bungee the high voltage controller upwards, with the bungee wrapped around the RH headrest.
- Remove and discard the two patch nuts on the 700 VDC 63 A compressor fuse, then remove the fuse.
- Do the same for the 700 VDC 63 A PCS output fuse – patch nuts discarded, fuse out.
- Remove the nut on the HV battery ancillary positive busbar, then lift the busbar off the AWD busbar and distribution assembly.
- Remove the nut attaching the negative AC harness to the negative HV battery DC link busbar.
- Remove the two 7 mm nuts attaching the AC negative harness to the transformer.
- Disconnect the HV carrier connector and remove the carrier retaining screw.
The bungee step looks like a shortcut; it is the opposite. Holding the controller up is what gives the carrier a straight pull upwards. Skip it and the plastic carrier becomes your lever.
Two ways to join the terminals
The default method: slide a 600 V heat shrink sleeve onto the harness, connect the two terminals with an M4 nut and bolt, torque to 2.5 Nm, then shrink.
The exception was added on 2026-05-07 and is the fastest way to date the copy of the manual you are working from: on HV carriers equipped with compressor negative coils, do not use a nut, a bolt and a sleeve. Use two 1104396-00-A nuts instead, and confirm the joint measures less than 70 micro-ohms. Any printed procedure older than May 2026 is missing that paragraph.
Four resistance limits, one meter routine
| Measurement point | Acceptable value |
|---|---|
| AC harness to negative HV battery DC link busbar | 55 micro-ohms or less |
| Terminal join on carriers with compressor negative coils | less than 70 micro-ohms |
| 63 A PCS fuse output joint; 63 A compressor fuse output joint | 105 micro-ohms or less |
| 63 A PCS fuse input joint; PTC heater fuse input joint | 145 micro-ohms or less |
The limits double from output to input, which is why the sequence matters: tight side first, loose side second. And every single test carries the same note – zero adjust the Hioki before testing. At this scale, probe contact resistance and clamping angle can shift a reading by more than the 40 micro-ohm gap between the 105 and 145 limits. Without the zero adjustment you are measuring your own setup, not the joint.
Where this retrofit goes wrong
- Quoting it inside the pack swap. It is a separate correction code, added within the same activity – never stacked, never absorbed.
- Reusing the compression nuts. The compressor and PCS fuse nuts and the PCS output bolts are replace items with part numbers printed in the table.
- Missing the two inverted M5 nuts. They go on the ancillary tray upside down; installed the other way they foul the cover.
- Leaving out the fuse access insulator. Three clips, and they are part of the closing sequence, not a cosmetic step.
- Testing before the fuses are marked. Torque mark first, then measure – otherwise a re-test after a disturb has nothing to compare against.
When to refuse the job
The barrier here is not skill, it is equipment. Without a micro-ohmmeter, without insulated T20 / 7 mm / 8 mm tooling and without the pyro dummy disconnect, none of the four limits can be verified. A conventional multimeter has a lead resistance of the same order as the 145 micro-ohm limit, so “we will check it with the Fluke” is not a substitute – the reading is noise. In that situation the right move is to hand the pack to a shop that has Toolbox access, the HV tool kit and a Hioki, and to say so on the quote rather than discovering it at the end.
Done properly, this is 1.02 hours of bench work: three fuses out, one carrier out, a sleeve and two terminals, four measurements and a pen mark. Done casually, it is a heater that never works and a warranty conversation nobody wins.
Stuck on a Fault Code or a Locked Module?
Our technicians work with Chinese OEM diagnostic tools every day. Send us the VIN and the fault codes — we’ll tell you exactly what to check, in what order, and what it costs.
Need the Parts?
We source OEM and OEM-equivalent parts for Chinese EVs and ship worldwide — brake pads, coolant pumps, charge ports, sensors and more.