Correction code 18401502 pays 0.36 hours for the shut off valve on the liquid cooled condenser, and the manual attaches a second code to it: if the refrigerant recovery and recharge is not already on the visit, 18200102 must be added as a separate correction inside the same activity. Half an hour is the valve. It is not the refrigerant.
The manual opens with a warning that is unusual in its bluntness: Model 3 thermal components operate under very tight specifications and can malfunction if procedures are not carefully followed, and technicians should not rely on past experience with other thermal management systems. For this Tesla Model 3 shut off valve replacement that warning is not decorative — the valve sits on the supermanifold, inside the liquid cooled condenser circuit, behind nine electrical connectors on a single harness plate.
Put the system in a state where it can be opened
- Set up the A/C machine.
- Run PROC_VCFRONT_X_START-THERMAL-FILL-DRAIN from Service Mode, Thermal, Actions, Start Thermal Fill/Drain.
- Respect the five-hour limit on that routine. Past five hours the expansion valves close on their own and the routine has to be run again.
- Verify valve positions at Garage, Thermal, Refrigerant loop EXV: LCC, CC Left, Evap, CC Right and Chiller at roughly 100 percent, Recirc at roughly 20 percent, and LCC Solenoid OPENED.
Then remove the underhood storage unit, recover the refrigerant, and confirm on the touchscreen that system pressure has dropped to atmospheric — about 1 bar — under Service Mode, Thermal, Refrigerant System. Power the car off through Safety, Power Off, take the A/C hoses off, and depress both Schrader valves. The manual warns specifically that depressing only one can cause injury.
Nine connectors, one harness plate
Remove the bolt holding the supermanifold-to-compressor line to the supermanifold — 22 Nm, 13 mm socket — and hang the line on the underhood storage unit support beam with an S-hook, positioned so that oil does not drip out. Then release, one at a time:
- the high pressure and temperature sensor
- the recirc EXV
- the liquid cooled condenser EXV
- the liquid cooled condenser shut off valve
- the right side cabin condenser EXV
- the high pressure and temperature subcool sensor
- the left side cabin condenser EXV
- the chiller EXV
- the evap EXV
Every one of those nine steps carries the identical caution: do not push down on the red locking tab. Pull the tab away from the connector until it unlocks, then keep pulling the connector body. Pressing the tab is the most common mistake on this job, and a broken tab means a harness, not a connector.
With all nine free, lift the supermanifold harness off the supermanifold and rest it on the frunk support beam. Only then is there room for a hand around the valve.
The valve itself: hand tools only
| Fastener | Torque | Tool | Reuse |
|---|---|---|---|
| Supermanifold-to-compressor A/C line bolt | 22 Nm | 13 mm socket | Reuse |
| Valve connector assembly to valve | 5 Nm | 3 mm hex | Reuse |
| Liquid cooled condenser shut off valve | 19 Nm | 1588744-00-A, 36 mm, 1/2 inch drive | Not applicable |
Remove the coil bolt, take the connector assembly off, then unscrew the valve. The caution appears twice, once for removal and once for installation: use only hand tools; impact or power tools will break the threads. A damaged thread here is not a damaged valve, it is a damaged supermanifold.
Going back together
- Lubricate the valve threads and O-rings with the specified A/C oil, then hand-start the valve into the supermanifold.
- Torque to 19 Nm with hand tools.
- Position the connector assembly so its tab aligns with the recess on the valve.
- Coil bolt to 5 Nm.
- Reconnect the nine connectors in reverse order, pushing each red tab toward the connector to engage the lock rather than pressing it.
- Fit new seal washers on the supermanifold side of the A/C line, lubricate them lightly with A/C oil, hand-tighten, then torque to 22 Nm.
The step that decides whether the compressor runs
Perform the vacuum leak test and oil injection, then recharge. The manual puts a hard caution on the recharge: follow it exactly or risk catastrophic damage to the cooling system, and do not disconnect the laptop yet. Unlock the vehicle gateway, then run TEST-SELF_VCFRONT_X_HEAT-PUMP-COMMISSIONING.
The note attached to that routine is the reason this job is not a 0.36-hour job in practice: if heat pump commissioning is not run after entering thermal drain and fill mode, A/C compressor operation will be blocked. Everything can be assembled correctly, pressures can be perfect, and the compressor still will not run — a condition easily written up as a failed compressor. Finish by disabling Service Mode, refitting the underhood storage unit, and closing up the LH front window and door.
Read the revision log before you trust an old video
The 2026-05-15 revision of this procedure added a step to check refrigerant system pressure and removed the first responder loop steps along with the thermal and HVAC performance test steps. Two consequences follow. Any tutorial still telling you to pull the first responder loop first is out of date, and because the performance test at the end is gone, verification now rests entirely on the heat pump commissioning routine. That leaves less margin than the older version had.
It also makes the quoting obvious: the refrigerant work is not inside 0.36 hours, and a repair order that presents it as one line item is either losing money or about to surprise the customer.
Stuck on a Fault Code or a Locked Module?
Our technicians work with Chinese OEM diagnostic tools every day. Send us the VIN and the fault codes — we’ll tell you exactly what to check, in what order, and what it costs.
Need the Parts?
We source OEM and OEM-equivalent parts for Chinese EVs and ship worldwide — brake pads, coolant pumps, charge ports, sensors and more.
Summarised and rewritten from the Tesla Model 3 service manual procedure “Shut Off Valve – Liquid Cooled Condenser (Heat Pump) (Remove and Replace)”, correction code 18401502, FRT 0.36, with 18200102 listed separately, revision log to 2026-05-15. Torque values, special tool numbers and routine names are quoted as published.