Correction code 44011652 pays 0.60 hours for a CCS charge port on a Tesla Model 3, and the manual is explicit that the figure already covers every linked procedure — rear trunk trim, the 12V disconnect, the voltage check. Do not stack correction codes on top of it. That is the first thing most quotes get wrong: 0.60 is not “two nuts and four bolts”, it is the whole trunk-strip plus a high-voltage measurement.
The fastener work really is trivial. There are exactly two torque values in this Tesla Model 3 charge port replacement, and both are 9 Nm. Everything that decides whether the car comes back in six weeks sits outside the torque table: a voltage check before you open anything, a tube of joint compound if you reuse the old port, and one resistance measurement you have to make with a meter before the car leaves.
Torque specifications: two rows, one hidden value
| Fastener | Torque | Tool | Reuse / Replace |
|---|---|---|---|
| Nut attaching the charge port busbar leads to the charge port assembly (x2) | 9 Nm | 10 mm deep socket | Reuse |
| Bolt attaching the charge port to the vehicle | 9 Nm | 10 mm deep socket | Reuse |
There is a third figure that does not appear in the summary table: if you reinstall the same charge port, the busbar studs on the back of the assembly get a torque check at 2 Nm with a Torx T10 bit. Fit a new port and you skip that step entirely, because a new assembly arrives pre-assembled and pre-coated.
Two revision notes that change the job
- 2023-10-27: the charge-port-to-body bolt torque was updated to 9 Nm. Any older printout or forum post quoting the earlier number is stale.
- 2023-10-10: a caution was added telling technicians not to manually close the charge port door. The same caution is repeated at the very last step of the install, which tells you it kept happening.
Before the busbars: PPE and the voltage check
The procedure is reserved for technicians who have completed the required certification courses, with a note that third-party technicians should undergo equivalent training. Insulating gloves must be class 0 (1000 V) with leather protectors and a glove tester. The only approved test method is an air check with a glove inflator — if either glove fails, the pair is scrapped, not retried. Expiry runs on a double clock: usable up to 12 months after the printed test date, but only 6 months after first use, whichever comes first.
After the 12V disconnect, run the charge port voltage check as its own linked procedure. The order is not negotiable: low voltage off, high voltage verified, then and only then touch the busbar leads. The safety cap over the busbar brackets is held by two tabs that you release with a pick; the manual specifically warns against prying with force because the cap damages easily.
Two connectors, two opposite red tabs
This is where comebacks are born, because the two red locking tabs want opposite motions:
- LH taillight connector: pull the red tab to disengage the lock — do not push down on it — then pull again to release the connector body.
- Charge port actuator connector: pull the red tab away from the connector until it unlocks, then keep pulling the main body. On reassembly you push the red tab towards the connector; pushing down or pulling up does nothing.
The manual also notes that earlier vehicles may be equipped with a different connector type. Judge by the connector in front of you, not by the illustration.
Reuse or replace decides the install sequence
A new charge port assembly has pre-applied electrical joint compound on its HV header. Reinstall the old one and you owe it four extra steps that the new-part route simply does not have:
- Clean the busbar HV header at the back of the assembly with an IPA wipe and let it dry for one minute. A plastic trim tool helps push the wipe into the crevices.
- Clean all residue and debris from the busbar leads and air dry for one minute.
- Apply two drops of electrical joint compound to each of the two busbar leads, on the side that contacts the charge port. The contact surfaces must be completely covered — partial coverage is the failure mode this step exists to prevent.
- Torque check the busbar studs at 2 Nm (Torx T10) before the leads go back on.
The manual includes two separate figures captioned “busbar bracket design may vary”. Same model, different build batches, different terminal geometry: read the compound coverage off the part in your hand.
The measurement that actually validates the repair
Gloves on, leather over-gloves on, then use a resistance meter to measure between each busbar lead and its stud — both leads, one at a time. The acceptable window is 0.050 mΩ (50 μΩ) to 0.270 mΩ (270 μΩ).
- Above 0.270 mΩ: too much resistance in the HV joint. Remove the fastener, clean the faces with isopropyl alcohol, refit, and measure again.
- Below 0.050 mΩ: reposition the probes and measure again. If it reads consistently low after four attempts, the test passes — carry on.
That is what contact resistance is doing in this job. Two 9 Nm nuts can be torqued perfectly and still leave a joint that heats up under 100 kW of DC charging. This single measurement is the difference between a repair and a delayed failure, and it is the step that a borrowed torque wrench and a YouTube video will not give you.
Customer complaint to actual cause
| What the shop hears | What usually happened |
|---|---|
| “It charged fine for a month, now AC charging drops out again” | Old port reused without joint compound, or no resistance measurement taken |
| “The charge port door will not sit flush / the actuator grinds” | Someone pressed the door shut by hand — the manual forbids it at both ends of the job |
| “The taillight and trunk light stopped working after the port was replaced” | Red tab pushed down instead of pulled on the LH taillight connector |
| “Insulation fault after a charge port repair” | Safety cap not re-seated on both tabs, or debris left on the busbar faces |
When to hand it over
Three hard gates. No HV certification and class 0 gloves: stop. No insulation/resistance meter of the Fluke 1507 or Hioki RM 3548 class: stop. No torque wrench that is honest at 2 Nm and 9 Nm: stop. Miss any one of them and this 0.60 hour job is not yours to take. With all three in place it is repeatable, well-paid work on a car that is now common enough to show up weekly.
What the 0.60 hours does not include
It does not include the busbar assembly itself (a longer, separate procedure), the charge port ECU, or the charge port door assembly. Quote those as separate lines. Bundling them into 0.60 is how a profitable job turns into an argument.
Stuck on a Fault Code or a Locked Module?
Our technicians work with Chinese OEM diagnostic tools every day. Send us the VIN and the fault codes — we’ll tell you exactly what to check, in what order, and what it costs.
Need the Parts?
We source OEM and OEM-equivalent parts for Chinese EVs and ship worldwide — brake pads, coolant pumps, charge ports, sensors and more.
Summarised and rewritten from the Tesla Model 3 service manual, Charge Port (Busbar Type) (CCS) (Remove and Replace), page revision 2026-08-09. All torque values, the resistance window and the step order come from that document; confirm against the latest revision for the vehicle’s build year before starting work.