Replacing the power conversion system coolant input tube on a Tesla Model 3 is a 2.94 hour job that looks like a hose swap and behaves like high-voltage work. It is gated by certification, it needs two model-specific tools, and the last step on the page is a voltage measurement before you are allowed to reconnect the pyrotechnic battery disconnect. This is the Tesla Model 3 PCS coolant tube procedure as written, with the ordering traps that catch people who treat it as plumbing.
The gate comes before the first step
The page opens with an explicit warning: only technicians who have completed all required certification courses are permitted to perform this procedure, and third party service providers are told to undergo equivalent training. Personal protective equipment and class 0 insulating gloves (minimum rating 1000 V) must be worn at all times a high voltage cable, busbar or fitting is handled. If your shop cannot satisfy that sentence, the job stops here — not at step nine.
Specifications and equipment
| Item | Value |
|---|---|
| Correction code | 16202002 |
| Flat rate time | 2.94 hours |
| Tool 1 | 1111868-00-B — Connector Removal, Coolant, PCS, M3 |
| Tool 2 | 1135762-00-A — Kit, Svc Plug, Cooling Hose, Model 3 |
| O-ring lubricant | Krytox 203 |
| Only torque value on the page | 6 Nm — 12V auxiliary battery negative terminal |
Read that last row again. There is exactly one torque figure in the entire procedure, and it is on the 12V earth lead. Everything else on this job is clips, o-rings and cleanliness.
Removal: the parts that are not obvious
- Drain the coolant from the power conversion system — there is a separate ancillary bay drain and refill procedure, and it is part of the time.
- Remove the pyrotechnic battery disconnect, then remove the high voltage controller. Both are linked procedures sitting between you and the tube.
- Release the harness clips on the hinge tray and hinges, then lift the hinge tray out.
- Cut a slit halfway through two absorbent pads and surround each coolant input tube fitting with a pad. This is the step people skip. The page then repeats, twice, the caution that spilled coolant can create an electrical path.
- Use the coolant connector removal tool to spread the tube fitting clips wider than the barb on the power conversion system, then pull up on the tool and the fitting together.
- Repeat for the second fitting at the battery flange, remove the tube, and install the service plugs into the power conversion system and the battery flange.
Installation: four checks in a fixed order
One: the o-rings. The page shows a good o-ring and a poor one side by side and tells you to confirm the o-rings are undamaged and properly seated in the connector groove before inserting the tube. Two: the lubricant. Lubricate the coolant input tube o-rings with Krytox 203 — not a generic silicone grease. Three: engagement. Press down firmly on both fittings, verify that both clips have fully engaged the barb on the power conversion system and on the battery flange, then pull up on the fittings to check retention. Four: the leak test. Perform an ancillary bay coolant leak test before you go any further.
The 12V sequence is deliberately backwards
After the leak test the page does something that reads like a mistake and is not: connect the 12V auxiliary battery negative terminal only, at 6 Nm, with a caution that says do not follow the procedure to connect 12V power at this time. Then connect a 12V charger to the battery terminals, refill the coolant, use the touchscreen to run Controls → Safety & Security → Vehicle Power → Power Off, disconnect the charger, and disconnect the negative terminal again. Power is being brought up and taken down in a controlled way to refill and park the thermal system, not to start the car.
Only after the hinge tray, the harness clips and the high voltage controller are back does the page allow the final step: measure the voltage across the pyrotechnic battery disconnect mount points, and then install the disconnect. Skipping that measurement means reconnecting a pyrotechnic device into a circuit you have not verified is dead.
Where shops lose money on this job
- Quoting the tube only. The page states that the correction code and its flat rate time reflect all work including linked procedures. That 2.94 hours already contains the drain and refill, the high voltage controller and the pyrotechnic disconnect. Adding them again is charging the customer twice; leaving the pyro disconnect out of your own planning is losing money.
- Pulling the tube before spreading both clips. The removal tool exists because the clips have to clear the barb. Pulling a fitting with one clip still engaged damages the barb on the power conversion system, and that is not a hose-level repair.
- Generic grease on the o-rings. Krytox 203 is named for a reason: this is a coolant circuit on an HV assembly, not a door seal.
- No pull test. A fitting that looks seated and pops off at temperature is a coolant loss plus an electrical path inside the ancillary bay.
- Connecting 12V power instead of the negative lead. The page is explicit and the caution is easy to skim.
When to hand it over
Three hard stops: no HV certification or no class 0 gloves in the shop; no coolant leak test capability; and any damage to the barb or the connector body on the power conversion system. The third one turns a tube replacement into an assembly-level decision, and it should be made before the vehicle is on the lift, not after.
If you are looking at a Model 3 with a coolant loss you have traced to the ancillary bay and you want to confirm whether the tube, the fitting or the connector body is the actual failure before you quote, we run that diagnosis with shops remotely on their own car.
Stuck on a Fault Code or a Locked Module?
Our technicians work with Chinese OEM diagnostic tools every day. Send us the VIN and the fault codes — we’ll tell you exactly what to check, in what order, and what it costs.
Need the Parts?
We source OEM and OEM-equivalent parts for Chinese EVs and ship worldwide — brake pads, coolant pumps, charge ports, sensors and more.
Source
Summarised and rewritten from the Tesla Model 3 service manual page “Tube – Input – Coolant – Power Conversion System (Remove and Replace)” (correction code 16202002), Tesla service documentation, en-us edition.